2021.12.28
December 28, 2021
Quzhou City, Zhejiang Province
earthwork
Piling machinery

Project Overview
Project Name: Longyou County Industrial Solid Waste Incineration Treatment Project
Construction unit: China Light Industry Changsha Engineering Co., Ltd
Construction unit: individual
Project address: Guotai Road, Longyou County, Quzhou City, Zhejiang Province
Field Devices:SR165、SR205、SR220
Drilling tool configuration: machine lock rod Φ377×4×12; Φ0.8mAuger bucket, Φ1mRock-socketed double-bottom sand bucket
Pile Diameter:0.8m、1.0m
The project0-10mreddish-brown backfill with clay;10-15mFor the weathered siltstone, the pile diameter is designed0.6m-1m; Pile depth10-15m, into the rock3-5m。 The customer who contracted the project, Mr. Wang, Yu2011Began to purchase Sany rotary excavation, currently has a number of Sany equipment, according to the existing equipment and the experience of other brands of rotary digging on the same site, Sany equipment has high reliability and low fuel consumption, so chooseSR165Construction.
SR165The performance is also very satisfying to the customer. Due to the characteristics of rod transportation, the transfer from Yiwu construction site to Quzhou is saved2000$ for shipping. Secondly, the pile can be guaranteed in a single day at the construction site10root of the efficient construction, while the average fuel consumption is only15-16L/hto achieve high efficiency and fuel saving.



