2023.10.25
October 2023
Luzhou City, Sichuan Province
Municipal utilities
Piling machinery
Project Location:Luzhou City, Sichuan Province
Device Model:SR435S
Pile diameter:1000mm
Pile Depth:25m
Geology:0~6m backfill
6~20m pebbles, stones
20~25m sandy mudstone
Construction technology:A full set of pipe construction technology
Construction Efficiency:In view of the holes that are easy to collapse in the backfill and pebble layer, a full set of pipe construction is adopted, the rotary excavation power head is equipped with a casing driver, and the casing is followed up 20m under the casing, and the unstable backfill, pebbles and stone formations are traversed, and the lower part is made into a hole by picking sand bucket at one time;
Including casing, soil extraction, and rock entry, the whole hole forming time is about 6h.