Electric tower pile construction case | Jinshang-Hubei ± 800 kV UHV DC transmission line project

  • 2024.05.31

Construction time

December 2023

Construction site

Lichuan City, Enshi Autonomous Prefecture, Hubei Province

The type of project

electricity

Device type

Piling machinery

Project Name:Jinshang-Hubei ± 800 kV UHV DC transmission line project

Contractor:Weifang Construction Co., Ltd

Project Location:Lichuan City, Enshi Autonomous Prefecture, Hubei Province

Project Introduction:

The 800 kV UHVDC transmission line project from the upper reaches of the Jinsha River to Hubei ± is the first UHV power grid project in Tibet, which adopts the new technology of UHVDC multi-terminal cascade independently developed by China, with a rated capacity of 8 million kilowatts. At the sending end of the project, two converter stations were built in Qamdo, Tibet, and Ganzi Prefecture, Sichuan, respectively, to bring together hydropower and new energy in the upper reaches of the Jinsha River, and the receiving end was to build Daye converter station in Huangshi, Hubei Province, and access to the UHV AC backbone grid in Central China.

The construction site is located between the mountains, the pile is located at the top of the mountain, the road is narrow, the excavator is needed to repair the road, and the transportation is through the "first four and eight back" vehicles, and the general long-distance board truck cannot enter the site due to the length limit.

Construction Equipment:SR135SCD00558

Drilling Diameter:φ1.4m、φ1.8m、φ2.0m、φ2.2m

Drilling Depth:About 10--16m

Construction Geology:Clay, mudstone, red sandstone

Drill pipe:Standard SK351VJ4× 10 machine lock drill pipe

Bucket:φ0.8.φ1.0.φ1.2 pick barrel drill, φ1.4.φ1.8.φ2.0.φ2.2 pick sand bucket

Construction difficulties and solutions:The rock strength of the red sandstone at the bottom is high and the pile diameter is large, so it is necessary to use the method of picking barrel drilling into the rock and grading reaming drilling.