Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Excavators
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

STC250 truck crane participated in the construction of Harbin-Dalian high-speed railway

  • 2016.07.15

Construction time

2010-08

Construction site

Harbin

The type of project

Railway/tunnel construction

Device type

crane

Harbin-Dalian high-speed railway (Harbin-Dalian passenger dedicated line) is a key project of the national "Eleventh Five-Year Plan", an important part of the Beijing-Harbin passenger dedicated line network in the "four vertical and four horizontal" passenger dedicated line network of the national "medium and long-term railway network planning", and is a high-speed railway with high design and construction standards of *8981 in the severe cold area at the northern end of *8981, Harbin-Dalian high-speed railway was officially opened for operation on December 1, 2012. It starts from Harbin City, Heilongjiang Province in the north, reaches Dalian City, Liaoning Province in the south, and runs through the three northeastern provinces, passing through Harbin, Changchun, Shenyang, Dalian four sub-provincial cities and six prefecture-level cities and their districts and counties. With a total length of 921 km, it is a two-track electrified railway. Among them, 81 kilometers are in Heilongjiang Province, 270 kilometers in Jilin Province, and 553 kilometers in Liaoning Province, with a total of 23 stations along the way.

Trinity