2016.07.15
2010-08
Chengdu
Housing construction
crane
Category: SCC2500 Project Name: Chengdu East Railway Station Construction Project Time: March 2010 Project Location: Chengdu User: Chengdu Juxiang Engineering Co., Ltd. Construction Introduction: On March 10, 2010, Chengdu Juxiang Engineering Co., Ltd. used Sany SCC2500 crawler crane 64.5 main boom and 25 meters fixed jib to lift the steel structure of the bus shelter at Chengdu East Railway Station.




