2016.07.15
2010-08
Yumen, Gansu
Construction of energy facilities
crane
Category: SCC4000 Project Name: World * 8982 Large Wind Turbine Base Wind Turbine Hoisting Project Time: April 2010 Project Location: Yumen, Gansu User: Hangzhou Jinhui Company Construction Introduction: In April 2010, our company's 400-ton crawler crane participated in the hoisting of wind turbines at the world's *8982 large wind turbine base, and the state invested nearly 50 billion yuan. Xinjiang Xinfeng Project Department undertook the installation of 1.5 MW wind turbines at the third wind power base in Changma, Yumen, Gansu Province. Industrial and mining configuration: 84 meters plus 9 meters fixed jib 6 times 100 tons hook, successfully hoisting 1.5 MW wind turbines, the tower is divided into three sections: *8982 section weighs 40 tons, the second section weighs 40 tons, and the third section weighs 28 tons. Generator set: 60 tons in weight. Height 73 m Fan blades: weight 35 tons. Ground clearance of generator set: 73 meters

Next article: 2015 SMQG Malaysia