挖机
Ask for a price Online store
Service Hotline 400-8878-318
挖机
Ask for a price Online store
Service Hotline 400-8878-318
Sany Heavy Industry Sany Heavy Industry Co., Ltd. (SH:600031)
Trinity International Sany International (HK:00631)
Sany Renewable Energy Sany Renewable Energy (SH:688349)

SCC2800WE in Inner Mongolia Xilin Gol League Jingneng Saihantala Wind Farm

  • 2016.07.15

Construction time

2009-07

Construction site

Inner Mongolia Xilin Gol League

The type of project

Construction of energy facilities

Device type

crane

After more than two months of commissioning and testing, the *8,983 Sany 1.5MW wind power hoisting special SCC2800WE crawler cranes that were unveiled at the 2008 Shanghai Bauma Exhibition were successfully shipped and delivered to the Jingneng Saihantala Wind Farm in Xilin Gol League, Inner Mongolia, after more than two months of commissioning and testing. Through the joint efforts of the company's technical support personnel and the customer's construction personnel, the crawler crane was assembled SCC2800WE the whole machine, and the ribbon-cutting ceremony was carried out by the main leaders of the customer and the wind farm project construction party on the 22nd. It is reported that on the day of the ribbon-cutting SCC2800WE actions such as lifting arm and full boom and walking under full counterweight were carried out, which was initially recognized by the leaders of the customer, Inner Mongolia Hohhot Xinpuyu Large-scale Hoisting Company, etc. On March 23, SCC2800WE officially started the hoisting of the 1.5MW wind turbine, and the whole hoisting process was smooth and smooth, and the hoisting task of the four wind turbines was completed on time, during which it experienced a strong wind of 14 m/s and several walks of 1.3-3.5 kilometers beyond the normal distance. During the construction period, Beijing Daqian and many other customers conducted on-site inspections on the working conditions of the equipment, and recognized and praised the stability and efficiency of the SCC2800WE hoisting process. At present, this equipment is being transferred to Dongying, Shandong Province, for the hoisting of 18 wind power equipment.

三一