Abu Dhabi, UAE
Petrochemical
crane
Construction time: 2012-06 Construction difficulties: 1. 24-hour long work; 2. The construction environment is harsh, and the temperature is as high as 60 degrees; 3. The construction conditions are harsh, cable-stayed and loaded. Equipment selection: Sany SRC550 Construction process: Participated in the Abu Dhabi National Petroleum Drilling Company (NDC) in the United Arab Emirates National Drilling Company (NDC) in the ABuhasa regional oil exploration infrastructure project, mainly used for transportation and installation of oilfield infrastructure facilities, Sany SRC550 performance is stable and reliable during the construction process, high temperature, long-term construction, equipment failure-free.
Customer evaluation: The construction party and the equipment leasing party have a very good evaluation of Sany equipment, and the SRC550 has the best performance in mobility and handling.