2016.07.15
2012-07
UAE
Petrochemical
crane
Construction time: 2012-07-22 Construction difficulties: 1. The operation time is long, two operators take turns, and the vehicle operates 24 hours a day; 2. The construction environment is harsh, hot desert area, the temperature is as high as 60 degrees; 3. The construction conditions are harsh, and the vehicle is not allowed to have any fault, cable-stayed and load-bearing operations. Equipment selection: Sany SRC550H Construction process: National Drilling Company, Abu Dhabi, UAE, referred to as NDC project, SRC550H With reliable product quality and stable product performance, we have completed the hoisting operation of one oilfield exploitation project after another. Customer evaluation: With the increase of national oilfield development projects in the United Arab Emirates, supporting infrastructure transportation and construction, in the harsh desert area, more and more rough terrain cranes will be put into construction in the future.