2020.10.12
August 19, 2020
Quannan County, Ganzhou City, Jiangxi Province
Construction of energy facilities
crane
Construction difficulties:It had rained heavily the night before the construction site, and the ground was slightly soft. There is heavy fog on the mountain, and the construction line of sight is limited. Under the premise of ensuring safety, the driver needs to wait for the fog to recede slightly, and then lift the fan blades for installation, and the whole lifting process, from the ground to the top, takes about time30 minutes.
Testimonials:TrinityThe red arm of the device is very recognizable, and the bright red arm can be accurately seen from the bottom up in foggy weather. The chassis leg structure of the equipment is solid, the micro-motion performance is good, the intelligent safety control of the whole machine is more advanced, and the equipment is reliable and safe to lift
LiftingParameter:
SCC6500A:
LiftingWeight:72.7ton;Load capacity:76%;
hostArm length:105rice;Jib Field:12 meters at an angle of 15°
Rear counterweight:210 tons; Central counterweight: 70 tons;
SAC2600:
Full reach arm length:73m, height: 73.1m
Lifting weight: 4.7 tons
Counterweight: 56 tons
Boom angle: 77.7°
Lifting distance: 17.2m