Jining City, Shandong Province
Municipal utilities
crane
The Weishan County People's Hospital Medical Care Complex Project covers an area of 147,772.49 square meters and a total construction area of 211,050 square meters. This time, 13 SFT80 (6010-6) participated in the construction.
SFT80(6010-6):
The maximum arm length is 60m, the independent height is 40.5m, and the standard section size: 1.6m ✕ 1.6m ✕ 2.8m;
The boom tip lifting load is 10t, the maximum lifting load is 6t, and the maximum lifting moment is 1069KN·m;
Using full frequency conversion control, lifting power 24KW, maximum lifting speed 100m/min, luffing power 4KW, maximum lifting speed 60m/min;
The fast-mounted machine structure shortens the installation time by 20%, and the main structure is a half-day tower with four cranes.