2021.03.13
2021-01-29
Shanxi Jinzhong
Construction of energy facilities
crane
Longyuan Heshun Phase II Wind Power Project is located in the southeast mountainous area of Heshun County, Jinzhong City, with an altitude of 2,050 meters above sea level and an average annual wind speed of 6.5 m/s.
This time, SAC16000S undertook the installation of a 3.0MW wind turbine with a height of 95m and a total weight of 150t in the nacelle (including spreaders and hooks). The main boom is 61.6m, and the jib F-54m is used without tower arm. The lifting time of the engine room is 20min for 0-95m, and the lifting time for the overall lifting of the impeller is 30min for 0-95m, with fast action and high efficiency.
Next article: SAC16000S - Attack everything, and the soldiers are fast