-
The first 100 million cubic meters of coalbed methane horizontal well platform in China was efficiently drilled
A few days ago, the Bao 8-1 Ping 3 well in Fugu County, Shaanxi Province was successfully drilled to 1,711 meters, marking the first 100 million cubic meter coalbed methane horizontal well assembly scale development project in China to fully and efficiently complete the drilling task, 34 days ahead of schedule, and the horizontal well coal seam drilling rate reached 98.2%.
Read more 2021.08.23 -
accounting for 78%! CNOOC became the main force in increasing domestic crude oil production in the first half of the year
In the first half of this year, CNOOC exceeded the task of increasing domestic oil and gas reserves and production, with crude oil increment accounting for nearly 80% of the national increase, production and operation performance reaching a record high, and handing over a brilliant mid-year report card.
Read more 2021.08.23 -
Sinopec won 100 billion cubic meters of gas fields! Sichuan-Chongqing "Qi Daqing" has good news again
The construction of "gas Daqing" in Sichuan and Chongqing continues to accelerate. Recently, news came from Sinopec that the exploration and development of Zhongjiang gas field of the Southwest Petroleum Bureau has made new discoveries, and the proven reserves of natural gas have increased by 34.029 billion cubic meters. Large-scale natural gas development continues to advance, and oil people are busy again!
Read more 2021.08.23 -
Is the "peak season" of the oil service industry coming? The Big Three are preparing for expansion
Recently, a number of oil companies announced their financial reports for the second quarter and the first half of the year, and the financial report data swept away the haze of the past, and revenue and profit increased significantly. While the industry is picking up, the performance level of oil service companies is also "rising". The performance of Schlumberger, Baker Hughes and Halliburton in the second quarter rose sharply.
Read more 2021.08.23 -
our country's 100 billion cubic meters of "abandoned" coalbed methane resources are expected to be released
In the list of 2020 Shanxi Province Science and Technology Award Projects announced a few days ago, the project "Research and Demonstration of Surface Coalbed Methane Extraction Technology in Abandoned Mine Goaf" won the first prize of scientific and technological progress. The project has carried out in-depth research on the enrichment law, resource evaluation and well location optimization of coalbed methane in the goaf of abandoned mines, and formed a complete set of surface extraction technology and technical system, and has built more than 100 pumping wells through the promotion and application of Jincheng, Xishan, Yangquan and other mining areas, and extracted and utilized more than 100 million cubic meters of coalbed methane.
Read more 2021.08.23 -
Resource development and utilization! 128 million cubic meters of coalbed methane extraction and utilization in Shanxi coal goaf
On August 17 this year, the Shanxi Provincial Department of Natural Resources reported that up to now, more than 100 pumping wells have been constructed in the goaf of abandoned mines in Shanxi Province, extracting and utilizing 128 million cubic meters of coalbed methane, equivalent to reducing carbon dioxide emissions by 1.92 million tons.
Read more 2021.08.22 -
Is the era of natural gas parity coming to an end?
Natural gas prices in Europe and Asia have recently risen sharply due to tighter natural gas supplies. As of the end of July, natural gas prices in Europe have soared by more than 1,000% from their all-time lows in May last year, LNG prices in Asia have risen nearly sixfold in the past year, and even in the United States, where natural gas production has exploded due to the shale revolution, gas prices have recently reached their highest level in 10 years.
Read more 2021.08.19 -
Technological innovation in Qinghai Oilfield promotes the speed and efficiency of drilling operations
Qinghai Oilfield has increased the management of drilling projects to ensure that the safety of well control is continuously controlled. As of August 13, Qinghai Oilfield has a cumulative drilling footage of 639,400 meters, and the quality pass rate of the well body has reached 100%. Due to the complex formation pressure system in Qaidam Basin, the characteristics of geological reservoirs are very different, there are many "three high, two shallow" wells, and the risk of well control is large, which affects the speed and efficiency of drilling operations.
Read more 2021.08.13 -
Changqing Oilfield has built our country's largest tight gas production base with high quality
A horizontal well deployed by the Changqing Oilfield tight gas project team in the Wushenqi area of Inner Mongolia was successfully completed, with a drilling depth of 8,528 meters and a horizontal section length of 5,256 meters, setting a new record for the longest horizontal section of an onshore horizontal well in Asia. Last year, Changqing Oilfield accounted for 70% of the country's tight gas production and has built our country's largest tight gas production base.
Read more 2021.08.12 -
KHL interview with Yu Hongfu: Focus on the three modernizations and move towards sustainable development
Sany Group/Market DynamicsDepth
Read more 2021.08.12 -
National Energy Administration: The development and construction of renewable energy power generation projects are scheduled on a monthly basis
Sany Renewable Energy/Market DynamicsRecently, the official website of the National Energy Administration officially released the "Notice of the General Department of the National Energy Administration on Monthly Scheduling of the Development and Construction of Renewable Energy Power Generation Projects", which proposes to further promote the development and construction of renewable energy power generation projects and ensure the achievement of the annual development and construction goals Construction scheduling. The reported projects include hydropower, wind power, photovoltaic power generation, biomass power generation, the promotion of distributed photovoltaics and source-grid-load storage projects in the whole county, and need to report development and construction problems and analysis on a monthly basis.
Read more 2021.07.30 -
The Ministry of Finance, the National Development and Reform Commission, and the Energy Bureau jointly issued a document to verify: whether new energy subsidy funds are distributed in a timely and fair manner!
Sany Renewable Energy/Market DynamicsRecently, the National Renewable Energy Information Management Center sent a letter to enterprises to assist in the verification of additional subsidy funds for renewable energy electricity prices in 2021. According to the "Notice on Carrying out the Verification of Renewable Energy Electricity Price Additional Subsidy Funds" jointly issued by the Ministry of Finance, the Price Department of the National Development and Reform Commission, and the New Energy Department of the National Energy Administration, the National Renewable Energy Information Center will verify wind power, photovoltaic power generation, biomass power generation projects and public independent system projects that enjoy the national renewable energy electricity price additional subsidy funds. Timely and fair distribution of subsidy funds, actual grid-connected capacity and approved (recorded) capacity
Read more 2021.07.30

